Rammed earth is a technique for construction foundations, floors, and walls using compacted natural raw materials such as soil, chalk, lime, or gravel. It is an ancient method that has been revived recently as a sustainability building method.
Under its French name of pisé it is also a material for , usually small and made in molds. It has been especially used in Central Asia and Tibetan art, and sometimes in China. 17 objects made from "loam" in the Rijksmuseum
Edifices formed of rammed earth are found on every continent except Antarctica, in a range of environments including temperate, wet, semiarid desert, montane, and tropical regions. The availability of suitable soil and a architecture appropriate for local climate are two factors that make its use favourable.
The French term "pisé de terre" or "terre pisé" was sometimes used in English for architectural uses, especially in the 19th century.
Historically, additives such as lime or animal blood were used to stabilize it.
Soil mix is poured into the formwork to a depth of and then compacted to approximately 50% of its original volume. The soil is compacted in batches or courses so as to gradually erect the wall up to the top of the formwork. Tamping was historically manual with a long ramming pole by hand, but modern construction systems can employ -powered tampers.
After a wall is complete, it is sufficiently strong to immediately remove the formwork. This is necessary if a surface texture is to be applied, e.g., by , carving, or mold impression because the walls become too hard to work after approximately one hour. The compressive strength of rammed earth increases as it cures. Cement-stabilized rammed earth is cured for a minimum period of 28 days.
In modern rammed earth buildings, the walls are constructed on top of conventional footings or a reinforced concrete slab base.
The construction of an entire wall begins with a temporary frame, the "formwork", which is usually made of wood or plywood, as a mold for each wall section's desired shape and dimensions. The form must be durable and well-braced, and the two opposing faces must be clamped together to prevent bulging or deformation caused by the large compressing forces. Formwork plays an important role in building rammed earth walls. Historically, wooden planks tied using rope were used to build walls. Modern builders use plywood and/or steel to build formwork.
Adding cement to soil mixtures low in clay can also increase the load-bearing capacity of rammed-earth edifices. The United States Department of Agriculture observed in 1925 that rammed-earth structures endure indefinitely and can be constructed for less than two-thirds of the cost of standard frame houses. Originally published by the United States Department of Agriculture, Washington, DC, USA. An alternative version is at:
Rammed earth works require at least one skilled person for quality control. All other workers can be unskilled or semi-skilled.
One significant benefit of rammed earth is its high thermal mass: like brick or concrete, it absorbs heat during the day and releases heat at night. This action moderates daily temperature variations and reduces the need for air conditioning and heating. In colder climates, rammed-earth walls can be insulated by inserting insulation such as styrofoam or rigid Fiberglass panels within internal and external layers of rammed earth. Depending on the type and content of binder, it must also be protected from heavy rain and insulated with vapour barriers.
Rammed earth can effectively regulate humidity if unclad walls containing clay are exposed to an internal space. Humidity is regulated between 40% and 60%. The material mass and clay content of rammed earth allows an edifice to breathe more than concrete edifices. This avoids problems of condensation and prevents significant loss of heat.
Rammed-earth walls have the colour and texture of natural earth. Waterproofing finishes, such as cement render, are not used by some people because they impair the ability of a wall to desorb moisture, which quality is necessary to preserve its strength.
Blemishes can be repaired using the soil mixture as a plaster and sanded smooth.
The thickness varies widely based on region and code. It can be as little as for non load-bearing walls and up to for load-bearing walls. The thickness and density of rammed-earth walls make them suitable for soundproofing. They are also inherently fireproof, resistant to termite damage, and non-toxic.
Rammed earth can contribute to the overall energy efficiency of edifices: the density, thickness, and thermal conductivity of rammed earth render it an especially suitable material for passive solar heating. Warmth requires almost 12 hours to be conducted through a wall thick.
Mixing cement with the soil can counteract sustainable benefits such as low embodied energy because manufacture of the cement itself creates 1.25 tonnes of carbon dioxide per tonne of cement produced. Although it has low greenhouse gas emissions in theory, transportation and the production of cement can add significantly to the overall emissions of modern rammed earth construction. For example, a 300mm rammed earth wall with 5% cement content produces slightly more emissions than a 100mm concrete wall.
An outstanding example of a rammed-earth edifice in Canada is St. Thomas Anglican Church in Shanty Bay, Ontario, erected between 1838 and 1841.
From the 1920s through the 1940s rammed-earth construction in the US was studied. South Dakota State College extensively researched and constructed almost one hundred weathering walls of rammed earth. For over 30 years the college investigated the use of paints and plasters in relation to colloids in soil. In 1943, Clemson Agricultural College of South Carolina published the results of their research of rammed earth in a pamphlet titled "Rammed Earth Building Construction". In 1936, on a homestead near Gardendale, Alabama, the United States Department of Agriculture constructed experimental rammed-earth edifices with architect Thomas Hibben. The houses were inexpensively constructed and were sold to the public along with sufficient land for gardens and small plots for livestock. The project successfully provided homes to low-income families.
The US Agency for International Development is working with developing countries to improve the engineering of rammed-earth houses. It also financed the authorship of the Handbook of Rammed Earth by Texas A&M University and the Texas Transportation Institute.
Interest in rammed earth declined after World War II when the cost of modern construction materials decreased. Rammed earth is considered substandard, and is opposed by many contractors, engineers, and tradesmen.
A notable example of 21st-century use of rammed earth is the façade of the Nk'Mip Desert Cultural Centre in southern British Columbia, Canada. As of 2014 it is the longest rammed earth wall in North America.
Contemporary Australian rammed earth construction first developed in the 1970s in Western Australia, where numerous examples of residential, educational, commercial, and community buildings have been constructed over the last 40 years. The rammed earth construction method is well established in Western Australia and is an economical option in that state.
In the past 30 years, cement-stabilised rammed earth (CSRE) has gained popularity in Australia. It consists of a mix of low-clay soil, water, and cement, and is an order of magnitude stronger than traditional rammed earth, withstanding compression forces up to 40 megapascals, giving it similar strength and durability to concrete.
Despite growing interest, one obstacle to wider adoption of rammed earth in Australia is the lack of a national building code specifically for rammed earth buildings, which discourages many engineers and architects from using it.
Drawing on the Daqing experience, China encouraged rammed earth construction in the mid-1960s. Starting in 1964, Mao Zedong advocated for a "mass design revolution movement". In the context of the Sino-Soviet split, Mao urged that planners should avoid the use of Soviet-style prefabricated materials and instead embrace the Proletariat spirit of on-site construction using rammed earth. The Communist Party promoted the use of rammed earth construction as a low-cost method which was indigenous to China and required little technical skill.
During the Third Front campaign to develop strategic industries in China's rugged interior to prepare for potential invasion by the United States or Soviet Union, Planning Commission Director Li Fuchun instructed project leaders to make do with what was available, including building rammed earth housing so that more resources could be directed to production. This policy came to be expressed through the slogan, "First build the factory and afterward housing." in Osoyoos, British Columbia, Canada, completed in 2006]]
History
United States and Canada
Australia
20th century China
United Kingdom
Africa
Europe
See also